Prep girls soccer: Long leads Meadowdale to 2-1 win over Mountlake Terrace

mavs logoBehind a pair of second-half goals by sophomore Lexa Long, Meadowdale downed Mountlake Terrace 2-1 in a Wesco 3A girls soccer match Tuesday night at Lynnwood High School.

Long got the Mavericks on the scoreboard with an unassisted goal in the 51st minute. The Hawks answered three minutes later with a score by sophomore Donnya Kvinge, assisted by freshman Abigail Johnson.

Meadowdale claimed the road victory after Long picked up her second goal in the 69th minute off an assist by junior Hannah Taylor.

Both teams are back on the soccer pitch on Thursday, Sept. 24; the Mavericks will face Marysville-Getchell at Edmonds Stadium while Mountlake Terrace travels to Marysville-Pilchuck to face the Tomahawks at QuilCeda Stadium.

Prep Girls Soccer: Meadowdale at Mountlake Terrace

Meadowdale 0          2          —          2
Terrace        0          1          —          1

Goal scorers:
Lexi Long (Meadowdale), unassisted, in the 51st minute
Donnya Kvinge (MTHS), assisted by Abigail Johnson, in the 54th minute
Lexi Long (Meadowdale), assisted by Hannah Taylor, in the 69th minute

Records: Mountlake Terrace 0-2-0 in Wesco 3A, 2-3-0 overall; Meadowdale 1-1-0, 2-3-0

Mountlake Terrace next match: vs. Marysville-Pilchuck, Thursday, Sept. 24, 7:30 p.m. at QuilCeda Stadium in Marysville

Meadowdale next match: vs. Marysville-Getchell, Thursday, Sept. 24, 7:30 p.m. at Edmonds Stadium

Leave a Reply

Your email address will not be published. Required fields are marked *

Real first and last names — as well as city of residence — are required for all commenters.
This is so we can verify your identity before approving your comment.

By commenting here you agree to abide by our Code of Conduct. Please read our code at the bottom of this page before commenting.